Product DESCRIPTION
The CZPT Link Assembly is made up of a main ring, two or far more sub-rings, in which the primary ring is fully cast, the sub-ring is welded, and the content is Alloy steel. The specification is one-100 tons,and the protection element is 4 times.
It is primarily utilised to assemble the spreader. The sub-ring is connected with the Url Chain and thechain link, and is assembled into a synthetic rigging for lifting weighty objects and products.
It can be utilised for equipment,industries.
The solution has handed the environmental management method certification, and can handlethe product certification of effectively-recognized classification societies such as CCS, LR, DNV, etc.
The product has high strength, mild weight, beautiful design and style, sturdy versatility, diverse functions, and convenient protection inspection
Specialized PARAMETERS
A-345 master url assembly breaking load (4XWLL) | ||||||||
specification | Inside size | Inside width | diameter | WLL(T) | Weight(KG) | |||
three/four | a hundred and forty | 85 | 70 | forty | twenty | 14 | 4.2 | 1.67 |
7/eight | one hundred sixty | 85 | ninety five | 40 | 22 | 14 | five.3 | two.two |
one | 178 | one hundred | 89 | sixty | 25 | 18 | 8 | 3.29 |
one-one/4 | 220 | 100 | one hundred ten | sixty | 32 | 22 | 14 | 6.three |
one-one/two | 267 | a hundred and eighty | 135 | 100 | 38 | 30 | 21.2 | 13.7 |
one-three/4 | 305 | one hundred eighty | 152 | a hundred | 45 | 32 | 30 | 21.25 |
two | 356 | a hundred and eighty | 178 | a hundred | fifty | 38 | 39.4 | thirty.34 |
2-1/4 | 406 | one hundred eighty | 203 | one hundred | 57 | forty five | forty five | 39.87 |
2-1/two | 406 | 355 | 203 | 178 | 64 | fifty | 55.five | sixty four.four |
2-three/4 | 406 | 406 | 241 | 203 | 70 | fifty seven | sixty three | 89 |
three | 457 | 406 | 228 | 203 | seventy six | sixty four | 70 | 112.14 |
Normally packed in plastic baggage, and then in export carton, higher high quality pallets Shipping Element: Usually twenty five-30 working days after acquiring your advance payment.Bulk packing
Packed in picket cases
Packed in paper packing containers, then in pallets
Supply Element:
Usually twenty five times right after receiving your progress payment.
FAQ
one.Are your maker or Investing Firm?
1st rigging is skilled company, a lot more than twenty years experience.
2. What products do you supply?
1) Lifting link chain, Coal Mining chain
2) Round CZPT link
3) Other related products
three.What is your direct time?
Normally 25-30 functioning days after obtaining your advance payment.
four. How do I receive the items ?
FOB, CFR, CIF are most frequently employed trade conditions.
5.How do I pay?
TT(Telegraphic Transfer),30% payment in progress, 70% balance
before shipment.
Contact US
Any fascination please come to feel free of charge to get in touch with Nancy!
Website: